Services

New-build apartment handover inspection in Batumi

We perform an independent handover inspection of your apartment before you sign the developer's acceptance act. We uncover hidden defects that normally only surface during renovation — by that time it is too late to demand remediation at the developer's cost.

What is included in the inspection

  • Geometry check: wall, floor and ceiling deviations measured by laser level
  • Engineering test: water pressure, cabling resistance, sewage gradients
  • Windows and balcony blocks: geometry, hardware, thermal imaging
  • Screed inspection for cracks, hollows and moisture content
  • Photo documentation of every defect mapped onto the floor plan
  • Defect report with technical justification for the developer

What is not included

  • Legal handling of the claim against the developer (separate contract)
  • Re-inspection after remediation (priced separately)
  • Title document review (a separate legal service)
  • Market valuation of the apartment

3 renovation packages — pick the one that fits

More about packages
FeatureRent-readyStandardPremium
AudienceInvestorFor yourselfPremium interior
Price from800 ₾/m²1,300 ₾/m²2,500 ₾/m²
MaterialsDurable entry-levelMid-rangeImported + designer
Design projectConcept sketchFull project
Duration, 1+1 (50 m²)45–55 days55–70 days70–85 days
Warranty24 months24 months24 months
Portfolio

Examples of defects we have found

premium
110

Apartment 3+1

New Boulevard · 140 days
from 165000 ₾
premium
85

Apartment 2+1

Zurab Gorgiladze St. · 130 days
from 145000 ₾
premium
68

Apartment 2+1

Kobaladze St. · 105 days
from 92000 ₾

How the inspection runs

01

Request

You submit a request, we clarify the property details.

02

Site measurement

Free on-site visit, measurements and technical brief.

03

Estimate

We prepare a detailed estimate and timeline.

04

Contract

We sign a contract with a fixed price.

05

Renovation with reports

Work on schedule, daily photo reports.

06

Handover

Final acceptance and warranty certificate.

24mo

24-month warranty — what it means in practice

The warranty period starts from the handover act date and covers all works, including hidden ones.

More about the warranty
What is covered
  • Leaks in wet zones
  • Paint and wallpaper peeling
  • Electrical defects
  • Plumbing failures caused by us
  • Mechanical damage to finishes caused by us
Resolution workflow
  1. 01Chat request with photo/video of the defect
  2. 02Diagnostics within 72 hours
  3. 03Fix within 10 business days
  4. 04Warranty case closure act
FAQ

Handover inspection FAQ

Free on-site measurement

Book a free on-site measurement

Our engineer will come to your apartment in Batumi at a convenient time, take measurements with a laser rangefinder, document the condition with photos and prepare an indicative estimate. All of this — 0 GEL, even if you do not later book the renovation with us.

  • Visit and measurements — free
  • Indicative estimate within 3 days
  • We also work from the developer's plan (if the unit is not handed over yet)
  • Manager responds within an hour
By clicking the button, you agree to the privacy policy.