New-build apartment renovation in Batumi
We handle every condition a developer can hand over to you: from bare concrete to nearly finished. We inspect the property, document developer defects, produce the estimate and run the full renovation cycle with remote control. Pick the scenario that matches your situation.
Choose your new-build scenario
Black-frame renovation
Turnkey black-frame apartment renovation in Batumi from 1,300 ₾/m². Screed, partitions, electrical and plumbing from scratch, plaster and full finishing. Suited to Orbi, Wave and other complexes where the unit is delivered as a bare shell with meters.
White-frame renovation
Turnkey white-frame apartment renovation in Batumi from 800 ₾/m². Screed and walls are already in place — we deliver final electrical and plumbing, finishing, kitchen and door installation. Shorter timeline and smaller budget than starting from black-frame.
New-build acceptance
Developer handover inspection in Batumi for 400 ₾. An engineer with a thermal imager, laser distance meter and multimeter checks geometry, finishing, electrical and plumbing. You receive a photo-backed defect list the developer is required to remediate before you sign the handover act.
3 renovation packages — pick the one that fits
More about packages| Feature | Rent-ready | Standard | Premium |
|---|---|---|---|
| Audience | Investor | For yourself | Premium interior |
| Price from | 800 ₾/m² | 1,300 ₾/m² | 2,500 ₾/m² |
| Materials | Durable entry-level | Mid-range | Imported + designer |
| Design project | — | Concept sketch | Full project |
| Duration, 1+1 (50 m²) | 45–55 days | 55–70 days | 70–85 days |
| Warranty | 24 months | 24 months | 24 months |
Batumi new-build case studies
New-build renovation FAQ
Book a free on-site measurement
Our engineer will come to your apartment in Batumi at a convenient time, take measurements with a laser rangefinder, document the condition with photos and prepare an indicative estimate. All of this — 0 GEL, even if you do not later book the renovation with us.
- Visit and measurements — free
- Indicative estimate within 3 days
- We also work from the developer's plan (if the unit is not handed over yet)
- Manager responds within an hour